Uptime testing reached 3 checks over the 1 259 days from June 15, 2021, for guadalajaracinemafest.com as per the data. The accessibility of guadalajaracinemafest.com was confirmed 3 times through all checks, including on August 26, 2021, when a 200 status code was returned. Inspecting guadalajaracinemafest.com as of November 25, 2024, revealed that no unavailability periods had occurred. As of November 25, 2024, no response had an error, according to all of the responses that were received. A response time of 6.637 seconds was recorded for guadalajaracinemafest.com on August 26, 2021, in contrast to the 3.767 seconds average response time.